Stairs · central stringer

Central-stringer stairs: prices and rules

A central stringer makes the treads look as if they float. Behind that lightness sits a calculated steel beam, solid timber treads and dimensions that forgive nothing.

9 min · Updated 5 November 2026

The central stringer is the staircase that makes treads look as if they float. A single axial beam carries cantilevered treads on both sides, with no side stringers: the eye passes underneath, light comes through, the room feels larger.

How it works

The stringer is a square S235 steel tube from 100 × 100 to 120 × 120 mm, or a slimmer welded box for taller stairs. Each tread is clamped to a bracket welded to the stringer, then bolted or welded depending on the material. Solid oak treads are 40 to 50 mm thick; steel treads are folded and stiffened. The engineering is not decorative: a 120 mm stringer with 6 mm walls spans 2.85 m with no perceptible deflection; smaller and the stair bounces underfoot and starts to vibrate. We check deflection — around L/300 under load — and natural frequency, because a trembling stair does not just feel wrong, it fatigues its own fixings.

Pitch, treads, headroom

Four numbers govern comfort, and they are all linked. Pitch sits between 25° and 35°, with the sweet spot at 28° to 32°. Riser height must stay between 17 and 18 cm: above 19 cm the stair feels hard, below 16 cm it stretches out and costs a lot of floor opening. Going stays between 24 and 28 cm. Blondel’s rule links the two: 2h + g should land between 58 and 64 cm — 17.5 cm rise with a 26 cm going gives 61 cm, the middle of the comfortable range. Headroom, measured vertically from tread nosing to ceiling or floor opening, must be at least 190 cm, and we aim for 200 cm. A recent Saumur project: 2.85 m to climb, 16 risers of 17.8 cm, 26 cm goings, 90 cm width, 205 cm headroom.

Floor opening and footprint

Floor length is simple arithmetic: (number of treads − 1) × going. Sixteen 26 cm treads project 3.90 m, so the opening needs 3.60 to 4.00 m depending on the last tread position and slab thickness, and at least 90 cm clear plus the guardrail. A central stringer needs a longer opening than a side-stringer stair of the same height, because headroom cannot be gained by raising the treads. If the existing opening is too short: increase the pitch (at the cost of comfort), switch to a quarter turn with a winder, or move a beam to open the floor further. We never draw without the opening plan and the finished ceiling height.

Guardrails and safety

Any stair rising more than 60 cm needs protection. The guardrail fixes to the treads or the stringer and follows the pitch: 1.00 m high measured vertically from the nosing, maximum 11 cm gaps, a continuous graspable handrail. On a central stringer the rail is usually a simple side frame of bars or tensioned cables, fixed to the treads themselves. The floor opening needs protecting too, so that nobody falls from the landing.

Prices by configuration

A central-stringer staircase is entirely made to measure: price depends on height, number of treads, species, guardrail and installation complexity. Ranges below include tax, a steel stringer, oiled solid oak treads, installation and a simple guardrail unless stated.

Central-stringer stairs — indicative prices, tax included
ConfigurationHeight / treadsPrice
Straight stair, 2.10 m12 oak treads€5,400
Straight stair, 2.85 m16 oak treads€7,500
Straight stair, 3.20 m18 oak treads€8,900
Quarter turn16 treads + winder€9,800
With intermediate landing20 treads€11,500
Stainless cable guardrailOption+€1,200
Steel treads instead of oakOption−€900

Indicative prices including 20% tax and installation, excluding floor opening work and plastering. Drawing and plan approved before fabrication.

Lead times and installation

Allow six to eight weeks from plan approval to installation. Design alone takes one to two weeks: survey, dimensioned drawing, deflection calculation, fixing choice, sign-off with you. Fabrication takes two to three weeks, finishing adds a week for oiled treads, and installation one to two days depending on height. We install after heavy building work and before painting, usually alongside electrics when step lights are planned. Clear access matters: a 3.90 m stringer does not fold around a twelve-tread stairwell.

More detail on the staircase page of the catalogue, and on the solid wood guide for species and maintenance.

Every project starts with a drawing, not a photograph.

Configure your piece for an instant price, or ask for a detailed quote: a dimensioned plan and a line-by-line quote within seven working days.

Frequent questions

What is the lead time for a bespoke piece?
From plan approval: two to three weeks for a stretch ceiling or pivot bar, three to four for a guardrail, four to six for a gate, three to five for a table, six to eight for a staircase. Repairs are prioritised, usually five to ten working days in the workshop.
Why are some quotes not instant?
Families available in the configurator (gates, standard guardrails, central-stringer stairs, tables, ceilings, braseros, pivot bars) price themselves live. Verrières and sculptures need a drawing and a take-off instead: we answer within seven working days with a dimensioned plan and a line-by-line quote.
What height should a guardrail be?
The French NF P01-012 standard sets a minimum of 1.00 m above finished floor, measured to the top of the handrail. Outdoors and on wind-exposed structures we build at 1.05 m. On stairs, height is measured vertically from the tread nosing, not along the pitch line.
How far apart should bars be?
Eleven centimetres maximum between two elements: that is the diameter of the sphere that must not pass through. No easy-to-climb horizontal element may sit between 45 and 90 cm from the floor. In the workshop we aim for 10 to 10.5 cm centres to keep a margin, and we favour vertical bars.
Do I need to be present during installation?
For a guardrail or a ceiling, no: we arrive self-contained and leave the site clean. For stairs or a motorised gate, yes at least for handover: leaf adjustment, safety-stop tests, remote controls and a short maintenance briefing.